Wednesday, November 30, 2011

New Corridor Cut

Here are photos of the new corridor I cut over Thanksgiving break:



Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

At this point, the trail will fork. One section will head down to the left, around a tree, and through a massive natural rock garden. The other section will head up to the right and will swing down to where I'm going to build a 3-4 foot drop in. There's already a natural drop-off below a tree, I just need to build it up some! Brush is getting thicker ever yard, it's going to be a lot more work...

2 comments:

scott,  November 30, 2011 at 8:06 PM  

Keep the updates coming. Looking forward to process step by step.

Greg Heil November 30, 2011 at 8:11 PM  

Thanks for the encouragement, Scott! I'll keep you posted!

Post a Comment

Labels

Counter

About Me

My photo
Greg Heil is the Editor in Chief for Singletracks.com. He's been writing and publishing online since before blogging existed.

About This Blog

Mountain biking, plain and simple. Trail reviews, ride reports, and philosophical musings induced by delirium from grinding up way too many vertical feet.

Read More

  © Blogger templates The Professional Template by Ourblogtemplates.com 2008

Back to TOP